Reference Specifications for Civil Engineering Work 2001



Yüklə 138,39 Kb.
səhifə5/22
tarix26.12.2016
ölçüsü138,39 Kb.
#3344
1   2   3   4   5   6   7   8   9   ...   22

2)QUALITY

2.1Inspection


Witness points

Refer annexure. Give sufficient notice so that inspection may be made at the following stages:

Bedding material prepared for kerb and channel.

Placing sub base and base.

Completion of each compacted layer.

Surfaces prepared for priming, sealing or surfacing.

At the commencement of asphalt surfacing.

Pavement marking set out ready for marking.

Hold points

Refer annexure. Do not proceed without approval. Give sufficient notice so that inspection may be made at the following stages:

Compliance testing certificates.


2.2Samples


General

Refer annexure. Submit to the testing authority samples of the following:

Each type of imported fill.

Each type of excavated material, which is to be re-used for constructing flexible pavement in the Works.

Identification

Attach a tag to each sample showing relevant information including description, source and nominal size of material.



Yüklə 138,39 Kb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   22




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.azkurs.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin