Timing: Record surface profile tolerance measurement following completion and within 30 days prior to the expiry date of the maintenance or defects liability period. This period is deemed to be 12 months from the work completion date.
Paved roadway and paved pedestrian surfaces: Reinstate surfaces to match existing features such as pit covers or driveways so that the pavement edges are within 0 mm to + 5 mm. Limit the maximum deviation relative to a 1.2 m straightedge to 5 mm, unless the crown camber overrides this requirement.
Unpaved pedestrian areas: No visual evidence of surface irregularities.
Dostları ilə paylaş: |