Microsoft Word - EP12-052(06)--008 CMH

Project number EP12-052 | August 2013 
Page 1 
ENVIRONMENTAL
ASSESSMENT REPORT
MUCHEA SCHEME AMENDMENT 
Project Number EP12-052
Prepared for Westbridge Property Group Pty Ltd 
August 2013   

Project number EP12-052 | August 2013 
Page i 
Prepared for Westbridge Property Group Pty Ltd  
Doc No.: EP12-052(06)--008 CKK | Revision: 001
ENVIRONMENTAL ASSESSMENT REPORT   
MUCHEA SCHEME AMENDMENT 
Document Control 
DOC NAME 
ENVIRONMENTAL ASSESSMENT MUCHEA SCHEME AMENDMENT 
DOC NO. 
EP12-052(06)--008 
REVISION 
DATE 
AUTHOR 
REVIEWER
1
August 2013 
Catherine Henry 
CH 
Chrystal King 
CK 
A
 
 
 
 
 
B
 
 
 
 
 
C
 
 
 
 
 
D
 
 
 
 
 
© 2013 Emerge Associates All Rights Reserved. Copyright in the whole and every part of this document belongs to Emerge 
Associates and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on 
any media to any person without the prior written consent of Emerge Associates. 

Project number EP12-052 | August 2013 
Page ii 
ENVIRONMENTAL ASSESSMENT REPORT   
Prepared for Westbridge Property Group Pty Ltd 
Doc No.: EP12-052(06)--008 CKK | Revision: 001
MUCHEA SCHEME AMENDMENT 
Executive Summary 
Emerge Associates were engaged by Westbridge Property Group Pty Ltd (Westbridge) to provide 
environmental consultancy services to support a request to initiate a town planning scheme 
amendment for part of Lot M1313 Great Northern Highway, Muchea to the “Industrial Development” 
zone under the Shire of Chittering Town Planning Scheme No. 6. 
This report provides a synthesis of information from a range of sources regarding the environmental 
features, attributes and values of the site. This includes existing information, plus site specific 
assessments and reporting that have been undertaken over the site including: 
x
Flora and Vegetation Survey and Wetland Assessment (Emerge Associates 2013a) (Appendix 
A)
x
Fauna Assessment (Greg Harewood 2013) (Appendix B)
x
District Water Management Strategy (Emerge Associates 2013b). 
This report summarises the results of these investigations, outlines the environmental attributes and 
values within the site and provides an assessment to support the proposed scheme amendment. 
Overall, the key environmental attributes and values present within or relevant to the site can be 
summarised as follows: 
x
The site is currently used for livestock grazing and some minor extractive activities. 
x
Two Resource Enhancement Wetlands (REW) are mapped within the site.  
x
Two waterways are mapped within the site. 
x
One Priority Ecological Community (PEC) was inferred to occur within the site (Priority 3 Floristic 
Community Type (FCT) 21c – Low–lying Banksia attenuata woodlands or shrublands). 
x
The majority of the remnant vegetation within the site (based on the Keighery scale (1994)) is in a 
“Completely Degraded” condition and retains little of its original ecological values.  
x
An area of “Good” condition banksia woodland is located in the east of the site.  
x
There is evidence of historic foraging by black cockatoos within the site. This evidence indicates 
both Carnaby’s black cockatoos and forest red-tailed black cockatoos have been present within 
the site. 
x
A local ecological linkage exists through the site as identified in the Shire of Chittering Local 
Biodiversity Strategy (2010).  
x
One registered Aboriginal heritage sites have been identified over the site and the wider local 
area. 
The majority of the remaining environmental values over the site are associated with an area of 
wetland and remnant vegetation located centrally within the site. This area only occupies a small 
portion of the site and can be accommodated into local open space as shown by the concept plan 
developed by CLE town planning and design that accompanies the proposed scheme amendment. 
Following the rezoning approval, a formal structure plan will be produced in accordance with proposed 
scheme text associated with the scheme amendment. Scheme provisions associated with the scheme 
amendment also propose an environmental management framework, which sets out the 
environmental management and reporting requirements that are required to support the planning and 
development process.   
As part of the local structure planning process, the scheme provisions require additional environmental 
investigations, assessments and reporting to be undertaken including: 

Project number EP12-052 | August 2013 
Page iii 
ENVIRONMENTAL ASSESSMENT REPORT   
Prepared for Westbridge Property Group Pty Ltd 
Doc No.: EP12-052(06)--008 CKK | Revision: 001
MUCHEA SCHEME AMENDMENT 
x
An Environmental Assessment and Management Strategy  
x
A Local Water Management Strategy (LWMS) 
x
A Land Capability Assessment should onsite effluent disposal be required 
x
A Strategic Noise Assessment and Management Strategy. 
Furthermore the following actions will be undertaken in the future planning process (including 
subdivision and development) to mitigate and manage any environmental impacts on the site: 
x
Preparation of an Urban Water Management Plan (UWMP) to manage stormwater over the site.  
x
Preparation of a Flora, Vegetation, Wetland and Waterway Management Plan for areas of 
development adjacent to wetlands, waterways and areas of retained native vegetation. 
x
Preparation of an Acid Sulphate Soil Assessment if excessive dewatering is required.  
x
Heritage investigations and section 18 approval pursuant to the Aboriginal Heritage Act 1972 if
disturbance to registered Aboriginal sites is required. 
x
Preparation of a Bushfire Management Plan for areas within 100 m of an “extreme” or “moderate” 
bushfire hazard. 
Overall, the environmental attributes and values within the site can be accommodated and/or 
managed through the preparation of an appropriate local structure plan and environmental 
management framework proposed through the scheme provisions (associated with the scheme 
amendment). As such there are no significant environmental issues or constraints within the site to the 
extent that it would preclude the site from being rezoned to “Industrial Development”. 

Project number EP12-052 | August 2013 
Page iv 
ENVIRONMENTAL ASSESSMENT REPORT   
Prepared for Westbridge Property Group Pty Ltd 
Doc No.: EP12-052(06)--008 CKK | Revision: 001
MUCHEA SCHEME AMENDMENT 
Table of Contents 
1
Introduction ................................................................................................................................................. 1
1.1
Background ....................................................................................................................................... 1
1.2
Purpose of the report ......................................................................................................................... 1
1.3
Scope of work undertaken ................................................................................................................. 1
2
Existing Environment and Site Specific Investigation ............................................................................ 3
2.1
Local context ..................................................................................................................................... 3
2.2
Climate .............................................................................................................................................. 3
2.3
Topography ....................................................................................................................................... 3
2.4
Geology ............................................................................................................................................. 4
2.5
Soils and landforms ........................................................................................................................... 4
2.6
Acid Sulfate Soils .............................................................................................................................. 4
2.7
Hydrology .......................................................................................................................................... 5
2.7.1
Groundwater ..................................................................................................................... 5
2.7.2
Surface water ................................................................................................................... 5
2.7.3
Public Drinking Water Source Areas ................................................................................ 7
2.8
Wetlands ........................................................................................................................................... 7
2.9
Flora and Vegetation ......................................................................................................................... 8
2.9.1
Regional context ............................................................................................................... 8
2.9.2
Flora and vegetation survey ............................................................................................. 9
2.9.2.1
Vegetation communities .................................................................................. 9
2.9.2.2
Vegetation condition ........................................................................................ 9
2.9.3
Significant flora ............................................................................................................... 11
2.9.4
Threatened Ecological Communities .............................................................................. 14
2.9.5
Weeds and invasive species .......................................................................................... 16
2.9.6
Ecological linkages ......................................................................................................... 16
2.9.7
Environmentally Sensitive Areas .................................................................................... 16
2.10
Terrestrial fauna .............................................................................................................................. 17
2.10.1
Fauna assessment ......................................................................................................... 18
2.10.1.1
Conservation significant species ................................................................... 19
2.10.1.2
Black cockatoo targeted survey .....................................................................  19
2.11
Existing and historical landuses ...................................................................................................... 20
2.12
Surrounding landuses ..................................................................................................................... 20
2.13
Heritage ........................................................................................................................................... 21
2.13.1
Indigenous heritage ........................................................................................................ 21
2.13.2
Non indigenous heritage ................................................................................................. 21
3
The Proposed Landuse, Planning and Approval Framework ............................................................... 23
3.1
Local scheme amendment .............................................................................................................. 23
3.2
The concept plan ............................................................................................................................. 23
3.3
Future planning and approval process ............................................................................................ 23
4
Environmental Assessment and Future Environmental Management Framework ............................. 25
4.1
Soils and landforms ......................................................................................................................... 25
4.1.1
Considerations for soils and landforms ........................................................................... 25
4.1.2
Future considerations for soils and landforms ................................................................ 26
4.2
Groundwater .................................................................................................................................... 26
4.3
Surface water .................................................................................................................................. 27
4.3.1
Considerations associated with surface water ................................................................  27
4.3.2
Future considerations for surface water ......................................................................... 27

Project number EP12-052 | August 2013 
Page v 
ENVIRONMENTAL ASSESSMENT REPORT   
Prepared for Westbridge Property Group Pty Ltd 
Doc No.: EP12-052(06)--008 CKK | Revision: 001
MUCHEA SCHEME AMENDMENT 
4.4
Wetlands ......................................................................................................................................... 27
4.4.1
Considerations associated with wetlands ....................................................................... 27
4.4.2
Future considerations for wetlands .................................................................................  28
4.5
Flora and Vegetation ....................................................................................................................... 28
4.5.1
Considerations associated with flora and vegetation ......................................................  28
4.5.2
Future considerations for flora and vegetation ................................................................ 28
4.6
Ecological linkages .......................................................................................................................... 29
4.7
Terrestrial Fauna ............................................................................................................................. 29
4.7.1
Considerations associated with fauna habitat ................................................................ 29
4.7.2
Future considerations for fauna habitat .......................................................................... 29
4.8
Landuses ......................................................................................................................................... 30
4.8.1
Considerations for existing and historical landuses ........................................................ 30
4.8.2
Considerations for surrounding landuses ....................................................................... 30
4.9
Indigenous heritage ......................................................................................................................... 31
4.9.1
Considerations for Indigenous heritage .......................................................................... 31
4.9.2
Future considerations for Indigenous heritage ................................................................ 32
4.10
Bushfire management ..................................................................................................................... 32
4.10.1
Considerations for bushfire management .......................................................................  32
4.10.2
Future considerations for bushfire management ............................................................ 32
5
Implementation ......................................................................................................................................... 33
6
Summary and Conclusion ....................................................................................................................... 35
7
References ................................................................................................................................................ 37
List of Tables 
Table 1: Summary of rainfall for 2010 and long term mean at Muchea Tree Farm weather station ............. 3
Table 2: Geological units located within the site. .......................................................................................... 4
Table 3: Geomorphic Wetlands Swan Coastal Plain dataset management categories (Hill et al. 1996) ...... 7
Table 4: Geomorphic Wetlands identified within the site. ............................................................................. 7
Table 5: Vegetation communities recorded by Emerge Associates (2013a) ................................................. 9
Table 6: Vegetation condition scale (Keighery 1994) ................................................................................. 10
Table 7: Definition of Rare and Priority Flora species (Atkins 2008) ........................................................... 11
Table 8: Categories of Threatened Species (EPBC Act, Section 178 & 179, 1999) ................................... 12
Table 9: Conservation coded flora known to occur within the vicinity of the site based upon database 
searches. .................................................................................................................................................... 13
Table 10: Categories of Threatened Ecological Communities utilised by the DPaW (DEC 2010) .............. 15
Table 11: Categories of DPaW Threatened Fauna ..................................................................................... 17
Table 12: DPaW priority Fauna Categories ................................................................................................ 17
Table 13: Species which may potentially use the site (based on SEWPAC Protected Matters search tool 
and DPaW Naturemap database) ............................................................................................................... 17
Table 14: Aboriginal Heritage sites identified within the site. ...................................................................... 21
Table 15: Aboriginal Heritage places identified within the site .................................................................... 21
Table 16: Summary of environmental factors, the scheme amendment response and future management 
at the subdivision and development stage. ................................................................................................. 33

Project number EP12-052 | August 2013 
Page vi 
ENVIRONMENTAL ASSESSMENT REPORT   
Prepared for Westbridge Property Group Pty Ltd 
Doc No.: EP12-052(06)--008 CKK | Revision: 001
MUCHEA SCHEME AMENDMENT 
List of Plates 
Plate 1: Example of flow path within northern portion of the site showing no defined channel form. ............ 6
Plate 2: The central waterway through site showing defined channel form and soil type. ............................ 6
Plate 3: The central REW located within the site showing wetland vegetation. ............................................ 8
Plate 4: “Good” condition Banksia woodland vegetation at the site. ........................................................... 11
Figures 
Figure 1: Locality Plan
Figure 2: Topography
Figure 3: Environmental Geology
Figure 4: Heddle Soils and Landforms Mapping
Figure 5: Acid Sulfate Soils Risk Mapping
Figure 6: Surface Water Features
Figure 7: Geomorphic Wetland Dataset Mapping
Figure 8: Vegetation Communities
Figure 9: Vegetation Condition
Figure 10: Ecological Linkage and Habitat Trees
Figure 11: Indigenous Heritage
Appendices
Appendix A
Flora and Vegetation Survey and Wetland Assessment Report
Appendix B
Fauna Assessment Report

Project number EP12-052 | August 2013 
Page 1 
ENVIRONMENTAL ASSESSMENT REPORT   
Prepared for Westbridge Property Group Pty Ltd 
Doc No.: EP12-052(06)--008 CKK | Revision: 001
MUCHEA SCHEME AMENDMENT 
1 Introduction 
1.1 Background 
Westbridge Property Group Pty Ltd (Westbridge) has an interest in the future development of Part Lot 
M1313 Great Northern Highway Muchea (herein referred to as “the site”) for industrial development. 
The site is currently zoned “Agricultural Resource” under the Shire of Chittering Town Planning 
Scheme No. 6 (TPS No. 6). A request to initiate a scheme amendment for the site is proposed in order 
to rezone the land to “Industrial Development”.  
The site has been included within the Muchea Employment Node Structure Plan (MENSP) (WAPC 
2011a). This structure plan provides a 20 year land use planning framework the introduction of 
industrial uses including service-based and complementary uses such as transport, livestock, 
fabrication, and warehousing, wholesaling and general commercial use. The MENSP (2011a) outlines 
the strategic and statutory context for the structure plan and identifies the landuse and environmental 
factors to be considered during future planning processes.  
1.2 
Purpose of the report 
This report provides a synthesis of information regarding the environmental attributes and values of 
the site.  This information was obtained from a range of sources including local and regional reports, 
databases, mapping and site specific investigations undertaken by Emerge Assocaites.  Combined, 
this information has been used to inform and support the proposed scheme amendment and to 
develop the associated scheme provisions. 
The primary purpose of this report is to present the environmental information that was used to assess 
the potential environmental impacts that could arise from the change in the landuse of the site. It 
references the planning framework to outline the future environmental management requirements to 
be undertaken at future planning stages in order to avoid and acceptably manage likely environmental 
impacts. 